CONSUMPTION
Approximately 1,5 kg of dry mass per 1 m2 with a thickness of 1 mm.
TECHNICAL DATA
Mixing ratio: 0.20-0.22 l water for 1 kg mortar
5.0-5.5 l water for 25 kg mortar
Open time: Approx. 20 minutes
Ready-for-use time: Approx. 0.5 hours
Pedestrian traffic: after approx. 12 h
Layer thickness 3-30 mm
Ambient and substrate temperature during work: from +5°C to +25°C
Compressive strength after 28 days ≥ 25 MPa
Bending strength after 28 days: ≥ 7 MPa